
Furthermore, all our manufacturing methods are in compliance with ISO9002 requirements for a specialised supplier of a total range of chains, sprockets, gears, equipment racks, V-belts, couplings and reducers, pto shaft, agricultural gearboxes….
|
Materials |
one. metal:Aluminum/Steel/Alloy steel/Stainless steel/Brass,copper,bronze etc. two. plastic: Stomach muscles,POM,PE,PP,PVC,Pc,PMMA,Teflon,nylon and so on. 3. other folks: carbon fiber, glass,fiberglass, wood, hard rubThe company was qualified by ISO9001:2008 Good quality Management Program.ber and so on. |
|
Shade |
Silver, Gray, Black ,Gold or as client’s requirement |
|
Floor Roughness |
Ra0.8 ( without sprucing or grinding) |
|
Brand Method |
laser engraving, CNC engraving, display-printing etc. |
|
Surface Finish |
Anodize sprucing zinc/nickel/chrome/gold plating, sand blasting, ect. |
|
Tolerance |
+/- .01–.05mm / can also be custom-made |
|
Certification |
ISO9001:2015 |
|
Processing equipments |
CNC machining centre,NC lathe, Grinding equipment, Automatic lathe machine, Traditional lathe device,Milling device,Drilling equipment,EDM,Wire-reducing equipment,CNC bending machine and many others |
|
Testing device |
Coordinate measuring equipment,Impression measuring instrument,Caliper and so forth |
|
Software |
Health-related Instruments/Electronic/ Industrial// Automation / motorcycle/3D printer |
|
Support |
OEM,ODM or as client’s prerequisite |
| Trade Terms | FOB, CIF, EXW |
| MOQ | 1Pcs |
| Port | xiamen, or as client’s necessity |
| Shipping and delivery | By air (DHL,UPS,Fedex,EMS and many others.),By Sea,Categorical… |
| Payment Technique | T/T(lender transfer),L/C,paypal,western union, moneygram,escrow, cash etc |
| Payment Conditions | fifty% just before creation, fifty% before shipping |
| Packing | interior box,several bins/master carton or as customer’s prerequisite |
| Supply time | 5-7days for Alanple time,five-25 times for creation |
Packaging & Delivery
Packaging Details
1. interior packaging: plastic wrap, bubble bag, PE foam, EPE cotton,PP bag and so forth.
two. outer packaging: carton box, wood scenario, plate and many others.
three. as for each customers’ requirement
Port
xiamen, or as client’s requirement
Guide Time :
| Amount(Items) | one – 20 | 21 – 100 | one hundred and one – 1000 | >1000 |
| Est. Time(days) | 5 | ten | 25 | To be negotiated |
If you will find something I can support, you should feel totally free to get in touch with with me
Telephone: 15359322298