{"id":841,"date":"2020-01-16T07:34:11","date_gmt":"2020-01-16T07:34:11","guid":{"rendered":"http:\/\/rigid-shaft-coupling.top\/fm-ul-certificated-casting-ductile-iron-pipe-fittings-shouldered-flexible-coupling-for-thermoelectric-and-military-piping-system\/"},"modified":"2020-01-16T07:34:11","modified_gmt":"2020-01-16T07:34:11","slug":"fm-ul-certificated-casting-ductile-iron-pipe-fittings-shouldered-flexible-coupling-for-thermoelectric-and-military-piping-system","status":"publish","type":"post","link":"https:\/\/rigid-shaft-coupling.top\/ko\/fm-ul-certificated-casting-ductile-iron-pipe-fittings-shouldered-flexible-coupling-for-thermoelectric-and-military-piping-system\/","title":{"rendered":"FM UL Certificated Casting Ductile Iron Pipe Fittings Shouldered Flexible Coupling for Thermoelectric and Military Piping System"},"content":{"rendered":"<p>Surface Treatment                            Epoxy Powder Coating                                                        EPT                            Yes                                                        Trademark                            Plato                                                        Transport Package                            Carton or Cartons on Pallet                                                        Specification                            customized                                                        Origin                            Weifang, Hangzhou Province, China                                                        HS Code                            73071100                                                                            <\/p>\n<h2>Product Description<\/h2>\n<p>                                                Item NameFlexible CouplingUseEngineering construction( fire protection,pipe transportation,water pipe, cable protection, mine industry,etc.)MaterialDuctile cast iron conforming to ASTM A-536, Grade 65-45-12CerificationISO 9001:2008,FM,UL,CCC and CE approvedTechnologyCastingColorMany colors available for choice(Blue,Red,Silver)Surface TreatmentEpoxy powder coating(Red color- RAL3000; Orange)Optional: Galvanized (Zinc Plated, HDG Or Dip painted)Size1&quot;-12&quot;Working Pressure300PSIConnect End TypeGrooved end ,Thread endDelivery15 daysPacking DetailsCartons or Cartons on PalletPaymentBy T\/T,L\/CEPTYESFactoryYESBrand NamePlatoType of production1) Rigid Coupling,Flexible Coupling, Reducing Flexible Coupling2) Long Radius and Short Radius Elbow (90&deg;\/45&deg;\/22.5&deg;\/11.25&deg;)3) Equal Tee, Grooved Reducing Tee, Grooved Reduing Tee(Threaded outlet)4) Grooved Mechanical Tee,Grooved Mechanical Cross5) Equal Cross, Grooved Reducing Cross6) Grooved Reducer, Threaded Reducer7) Adapter Flange, Grooved Split Flange8) Cap,End CapNominal SizePipe ODWorking PressureBolt sizeDimensionsCertificateUnit( mm\/inch)Unit( mm\/inch)Unit( mm\/inch)Unit(Psi\/Mpa)Unit( mm)ABC25133.71.3273002.0710*45562.205963.780451.772FM UL3211\/442.41.6693002.0710*45662.5981064.173451.772FM UL4011\/248.31.93002.0710*45722.8351144.488451.772FM UL50260.32.3753002.0710*50813.1891264.961471.772FM UL6521\/2732.8753002.0710*55953.7401395.472471.772FM UL653OD76.133002.0710*55993.8981435.630471.772FM UL80388.93.53002.0710*551124.4091576.181481.890FM UL1004114.34.53002.0712*651385.4331937.598501.969FM UL12551\/2OD139.75.53002.0712*651666.5352218.701501.969FM UL1255141.35.5633002.0712*651696.6542228.740501.969FM UL15061\/2OD165.16.53002.0712*701937.5982509.843512.008FM UL1506168.36.6253002.0712*701967.71725610.079512.008FM UL2008219.18.6253002.0716*8525410.00032212.677632.480FM UL2501027310.753002.0720*10031312.32339215.433642.520FM UL30012323.912.753002.0720*11036614.40944517.520662.598FM ULWeifang Plato Import &amp; Export Co., Ltd. is a comprehensive high-tech enterprise integrating research, development, production&amp; sales as a whole, specializing in the research and development and manufacturing of grooved pipe fittings, with an annual production capacity of more than 1,000,000 tons, is among the best company of china in this industry. FAQQ: Are you trading company or manufacturer ? A: We are a factory.Q: How long is your delivery time?A: Generally 15 days after the down payment. EPT 30 to 90 days.Q: Do you provide samples ? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay the cost of freight.Q: What is your terms of payment ?A: Payment&lt;=1000USD, 100% in advance.Payment&gt;=1000USD, 30% T\/T in advance ,balance before shippment.If you have another question, pls feel free to contact us.                                                                <\/p>\n<h2>Basic Info.<\/h2>\n<p>                                                                                        Surface Treatment                        Epoxy Powder Coating                                                                                EPT                        Yes                                                                                Trademark                        Plato                                                                                Transport Package                        Carton or Cartons on Pallet                                                                                Specification                        customized                                                                                Origin                        Weifang, Hangzhou Province, China                                                                                HS Code                        73071100                                                                        <\/p>\n<h3>Product Description<\/h3>\n<h3>Customer Question &amp; Answer                      Ask something for more details                (0)<\/h3>\n<p>                                                                Item NameFlexible CouplingUseEngineering construction( fire protection,pipe transportation,water pipe, cable protection, mine industry,etc.)MaterialDuctile cast iron conforming to ASTM A-536, Grade 65-45-12CerificationISO 9001:2008,FM,UL,CCC and CE approvedTechnologyCastingColorMany colors available for choice(Blue,Red,Silver)Surface TreatmentEpoxy powder coating(Red color- RAL3000; Orange)Optional: Galvanized (Zinc Plated, HDG Or Dip painted)Size1&quot;-12&quot;Working Pressure300PSIConnect End TypeGrooved end ,Thread endDelivery15 daysPacking DetailsCartons or Cartons on PalletPaymentBy T\/T,L\/CEPTYESFactoryYESBrand NamePlatoType of production1) Rigid Coupling,Flexible Coupling, Reducing Flexible Coupling2) Long Radius and Short Radius Elbow (90&deg;\/45&deg;\/22.5&deg;\/11.25&deg;)3) Equal Tee, Grooved Reducing Tee, Grooved Reduing Tee(Threaded outlet)4) Grooved Mechanical Tee,Grooved Mechanical Cross5) Equal Cross, Grooved Reducing Cross6) Grooved Reducer, Threaded Reducer7) Adapter Flange, Grooved Split Flange8) Cap,End CapNominal SizePipe ODWorking PressureBolt sizeDimensionsCertificateUnit( mm\/inch)Unit( mm\/inch)Unit( mm\/inch)Unit(Psi\/Mpa)Unit( mm)ABC25133.71.3273002.0710*45562.205963.780451.772FM UL3211\/442.41.6693002.0710*45662.5981064.173451.772FM UL4011\/248.31.93002.0710*45722.8351144.488451.772FM UL50260.32.3753002.0710*50813.1891264.961471.772FM UL6521\/2732.8753002.0710*55953.7401395.472471.772FM UL653OD76.133002.0710*55993.8981435.630471.772FM UL80388.93.53002.0710*551124.4091576.181481.890FM UL1004114.34.53002.0712*651385.4331937.598501.969FM UL12551\/2OD139.75.53002.0712*651666.5352218.701501.969FM UL1255141.35.5633002.0712*651696.6542228.740501.969FM UL15061\/2OD165.16.53002.0712*701937.5982509.843512.008FM UL1506168.36.6253002.0712*701967.71725610.079512.008FM UL2008219.18.6253002.0716*8525410.00032212.677632.480FM UL2501027310.753002.0720*10031312.32339215.433642.520FM UL30012323.912.753002.0720*11036614.40944517.520662.598FM ULWeifang Plato Import &amp; Export Co., Ltd. is a comprehensive high-tech enterprise integrating research, development, production&amp; sales as a whole, specializing in the research and development and manufacturing of grooved pipe fittings, with an annual production capacity of more than 1,000,000 tons, is among the best company of china in this industry. FAQQ: Are you trading company or manufacturer ? A: We are a factory.Q: How long is your delivery time?A: Generally 15 days after the down payment. EPT 30 to 90 days.Q: Do you provide samples ? is it free or extra ?A: Yes, we could offer the sample for free charge but do not pay the cost of freight.Q: What is your terms of payment ?A: Payment&lt;=1000USD, 100% in advance.Payment&gt;=1000USD, 30% T\/T in advance ,balance before shippment.If you have another question, pls feel free to contact us.<\/p>","protected":false},"excerpt":{"rendered":"<p>Surface Treatment Epoxy Powder Coating EPT Yes Trademark Plato Transport Package Carton or Cartons on Pallet Specification customized Origin Weifang, Hangzhou Province, China HS Code 73071100 Product Description Item NameFlexible CouplingUseEngineering construction( fire protection,pipe transportation,water pipe, cable protection, mine industry,etc.)MaterialDuctile cast iron conforming to ASTM A-536, Grade 65-45-12CerificationISO 9001:2008,FM,UL,CCC and CE approvedTechnologyCastingColorMany colors available for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[2],"class_list":["post-841","post","type-post","status-publish","format-standard","hentry","category-rigid-shaft-coupling","tag-rigid-shaft-coupling"],"_links":{"self":[{"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/posts\/841","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/comments?post=841"}],"version-history":[{"count":0,"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/posts\/841\/revisions"}],"wp:attachment":[{"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/media?parent=841"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/categories?post=841"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rigid-shaft-coupling.top\/ko\/wp-json\/wp\/v2\/tags?post=841"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}